Polipark and Hotel Dorint

Riazzino – Hotel and hospitality

Context

On the former Polivideo site in Riazzino, 17,000 m² idle since the 2018 bankruptcy, Tigestim bought, designed and built a district with shops, offices and the Hotel Dorint: permit in May 2022, the first shops on 22 February 2024, the 82-room hotel on 7 October 2024, the retail piazza in 2026. For the hotel we also took care of lobby and reception, entrance, poolside bar and terrace pergola, choosing materials, furniture and lighting.

In detail

A hotel of 82 rooms on four levels, with spa, restaurant and multi-purpose rooms. For the hotel: lobby and reception, entrance, poolside bar and terrace pergola, with materials, furniture, made-to-measure benches and lighting chosen by us.

Our role

Purchase of the site, development, design and site management (2022–2026). Hotel interiors (2024)

Result

Four-star hotel with 82 rooms opened on 7 October 2024. Lidl since February 2024. Retail piazza inaugurated in October 2026.

Location
Riazzino
Type
Hotel and hospitality
Year
2024
Client
Gruppo Tigestim, gestore Dorint

Gallery

36 photos

Got questions or want to talk?