Context

The EMEA headquarters in Stabio, on Tigestim’s land: 15,000 m² of labs, offices and showroom, built by Tigestim as general contractor and delivered in 2013. In 2020 came the new entrance with its reception and, a few steps away, the VF3 open space, with Tigestim’s site management.

In detail

In 2020 the new entrance with reception, 80 m², and a few steps away the VF3 open space of over 1,000 m².

Our role

General contractor for the EMEA headquarters (2013). New entrance and reception (2020). Site management of the VF3 open space (2020)

Result

15,000 m² delivered in 2013, then two further projects in 2020.